# Bursa Uludağ: Elekta LINAC Room Infrastructure

> Elekta LINAC room preparation at Bursa Uludağ University Hospital with MEDITEL: wall shielding, door refurbishment and electrical and mechanical infrastructure.

Language: en

[HTML page](https://rftechnic.com/en/projects/bursa-uludag-elekta-linac-oda-altyapisi)

Türkiye

Elekta LINAC room preparation at Bursa Uludağ University Hospital with MEDITEL: wall shielding, door refurbishment and electrical and mechanical infrastructure.

Country

![](https://rftechnic.com/assets/components/flags/TR.svg) Türkiye

Related services

[LINAC doors and radiotherapy shielding](https://rftechnic.com/en/lead-shielding)[LINAC room planning](https://rftechnic.com/en/engineering-consulting)

Facility

Bursa Uludağ Üniversitesi Hastanesi

Equipment and room context

Conversion of an existing room for an Elekta LINAC

Project cooperation

MEDITEL HEALTHCARE

Scope completed by RF

Room infrastructure, wall shielding, revision of the existing LINAC door, electrical and grounding preparation.

Handover stage

Room infrastructure was handed over ready for equipment installation. LINAC installation and clinical acceptance are outside the completed scope of this record.

![Large dark wall panel and equipment pit in the floor — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-03.png)

RF Teknik Medikal completed room infrastructure preparation for an Elekta linear accelerator at Bursa Uludağ University Hospital, together with MEDITEL HEALTHCARE. The treatment room was handed over ready for the new equipment’s installation and commissioning stages.

## Radiation shielding and door refurbishment

Wall shielding work was carried out and the existing LINAC door was refurbished. Mechanical and structural preparations followed the Elekta system’s room requirements.

## Electrical infrastructure and site coordination

Power distribution, earthing and auxiliary systems were adapted. Site checks and coordination between disciplines supported completion of the infrastructure works. This room conversion followed [removal of the Siemens Primus and Somatom systems](https://rftechnic.com/en/projects/bursa-uludag-siemens-primus-somatom-demontaj).

## Project photos

![Open rectangular equipment pit in the finished treatment room — Bursa Uludağ](https://rftechnic.com/assets/project-media/05e32457aff7774e-480.webp)

Open rectangular equipment pit in the finished treatment room

![Wood-finished cabinets and open shelving in the room — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-02.png)

Wood-finished cabinets and open shelving in the room

![Large dark wall panel and equipment pit in the floor — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-03.png)

Large dark wall panel and equipment pit in the floor

![Long work counter in the control area — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-04.png)

Long work counter in the control area

![Work counter and wall-mounted control display — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-05.png)

Work counter and wall-mounted control display

![LINAC and patient table in the treatment room — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-06.png)

LINAC and patient table in the treatment room

![Team member working at the patient table base — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-07.png)

Team member working at the patient table base

![Open treatment-room door and passage into the room — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-08.png)

Open treatment-room door and passage into the room

![Partly closed sliding door at the treatment-room entrance — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-09.png)

Partly closed sliding door at the treatment-room entrance

![Team and work equipment during room renovation — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-10.png)

Team and work equipment during room renovation

![Treatment room with wall and floor finishes removed — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-11.png)

Treatment room with wall and floor finishes removed

![Rubble and exposed services after floor breaking — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-12.png)

Rubble and exposed services after floor breaking

![Room with exposed ceiling ducts and services — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-13.png)

Room with exposed ceiling ducts and services

![Work on the metal mounting frame in the floor — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-14.png)

Work on the metal mounting frame in the floor

![Scaffold and equipment mounting frame in the floor — Bursa Uludağ](https://rftechnic.com/uploads/projects/bursa-uludag-elekta-linac/bursa-uludag-elekta-linac-15.png)

Scaffold and equipment mounting frame in the floor