Technical guides for radiotherapy projects.
Explore practical questions about LINAC installation, relocation, shielding, maintenance, spare parts and project planning.
LINAC Installation: Site Readiness and Acceptance
LINAC installation connects room readiness, equipment movement, assembly and connections with separate acceptance steps. Define the model, access, utilities and test owners before requesting a quote.
Read guideLINAC Decommissioning, Relocation and Reinstallation
LINAC relocation includes dismantling, packing, transport, destination readiness and reinstallation. Decommissioning can end at removal; a relocation quote also defines the destination work and handovers.
Read guideLINAC Doors and Shielding: Design and Quote Inputs
LINAC bunker door fabrication and installation depend on equipment, room and approved shielding design. Compare dimensions, materials, access and verification responsibilities against the same project.
Read guideLINAC Maintenance: Service Plans and Work Records
A LINAC maintenance plan uses equipment documents, service history and site conditions. Record preventive maintenance, fault intervention and clinical checks as separate scopes with named owners.
Read guideRadiotherapy Spare Parts: Compatibility and Quotes
Request radiotherapy spare parts with the model, part reference, revision, quantity and destination. Confirm compatibility, condition, warranty, returns and delivery scope in writing before ordering.
Read guideRadiotherapy Centre Planning: Technical Work Packages
Radiotherapy centre planning connects equipment, room, infrastructure and team responsibilities. Define work packages, missing inputs and decision owners before committing to budgets or dates.
Read guideLet's talk about your radiotherapy project.
Installation, relocation, shielded doors or spare parts; tell us what you need and our technical team will get back to you.