Istanbul Beykent: Elekta Versa HD Room Preparation and Lead Door
Elekta Versa HD room infrastructure and lead door fabrication and installation at Istanbul Beykent University Hospital with ONCOTECH.
- Country
Türkiye
- Related services
- LINAC doors and radiotherapy shieldingLINAC room planning
- Facility
- Istanbul Beykent University Hospital
- Equipment and room context
- Room preparation for Elekta Versa HD
- Project collaboration
- ONCOTECH Medikal Sistemler
- Work carried out by RF
- Room infrastructure and lead-door fabrication and installation.
- Stage reported in the announcement
- Room and door work; LINAC equipment installation is described as the next stage in the announcement.

RF Teknik Medikal carried out Elekta Versa HD room infrastructure work and lead door fabrication and installation at Istanbul Beykent University Hospital, together with ONCOTECH Medikal Sistemler.
Room infrastructure
Work covered floor, wall and ceiling preparation, surface finishes and fixed fittings. Site work in the treatment room and control area formed part of the preparation for equipment installation.
Lead door fabrication and installation
Lead door fabrication and on-site installation were completed alongside the room infrastructure works. This project stage covered room and door preparation for the Elekta Versa HD installation.
Project photos



















Let's talk about your radiotherapy project.
Installation, relocation, shielded doors or spare parts; tell us what you need and our technical team will get back to you.
Get a quote