Van: Cobalt-60 Removal and Elekta Versa HD Room Preparation
Cobalt-60 removal, Elekta Versa HD room preparation and LINAC door design, fabrication, installation and commissioning at Van Yüzüncü Yıl University Hospital.
- Country
Türkiye
- Related services
- LINAC doors and radiotherapy shieldingLINAC room planning
- Facility
- Van Yüzüncü Yıl Üniversitesi Hastanesi
- Equipment and room context
- Existing Cobalt-60 unit → room preparation for Elekta Versa HD
- Scope completed by RF
- Cobalt-60 removal; room infrastructure; lead-door design, manufacture, installation and commissioning of the door system.
- Handover stage
- Room infrastructure was handed over ready for equipment installation. LINAC installation and clinical acceptance are outside the completed scope of this record.

RF Teknik Medikal completed removal of a Cobalt-60 unit and preparation of the treatment room for an Elekta Versa HD linear accelerator at Van Yüzüncü Yıl University Hospital. The project included room infrastructure and a custom lead door system.
Cobalt-60 removal and room conversion
Following removal of the existing equipment, the room was adapted to the Elekta Versa HD system’s technical and structural requirements. The infrastructure was prepared for installation of the new accelerator.
LINAC door design, fabrication and installation
The door system was designed and fabricated with photon, electron and neutron protection requirements in mind. Installation and commissioning were completed, and the door was handed over in working order.
Door system
Project photos

Let's talk about your radiotherapy project.
Installation, relocation, shielded doors or spare parts; tell us what you need and our technical team will get back to you.
Get a quote